Full on superstructure rebuild and outboard conversion has begun

For general discussion about Alcan boats
Post Reply
Paul
Posts: 12
Joined: Tue Apr 06, 2021 12:10 am

Full on superstructure rebuild and outboard conversion has begun

Post by Paul »

demo complete wit a lot more rot than expected. reframe is almost complete with Douglas fur, next step will be rewire, spray foam and re sheet the exterior with 1/8' aluminum instead of wood. parting out the Volvo DP legs and motors.
Attachments
64426774251__76FBE079-C686-4F4C-8D51-694D0A3D5A1A.JPG
Paul
Posts: 12
Joined: Tue Apr 06, 2021 12:10 am

Re: Full on superstructure rebuild and outboard conversion has begun

Post by Paul »

when purchacing I figured there would be some rot as I brought a moisture meter and some some slight staining but very little.
If you ever want to buy an Alwest make sure to spend the time and tell the owner that you will be taking off the inside aluminum window trims that sandwiches the frame, this will reveal a lot without causing any damage.
Attachments
krVti276SieYT%cYur2VXw.jpg
95781033-5C72-40CF-B30C-A4882AB15705.jpg
TGMvpviAQl2aXaD3L2a73A.jpg
Post Reply